Islisberg
Switzerland, Zurich
2004 – 2006

Less through traffic! That's what the people of Zurich aimed at. To meet these demands a western bypass is to be built which would reduce traffic through the city coming into and out of Central Switzerland. The longest underground stretch will be the Islisberg tunnel with two tubes and a length of five kilometers.

Tunnelling work with the Single Shield TBM by Herrenknecht on the western tunnel was completed in April 2005, after just 54 weeks of single shift work. The TBM was then repositioned and converted before starting work on the next tunnel. After one year's tunnelling, breakthrough of the eastern Islisberg tunnel was achieved on July 12, 2006. On November 13, 2009 the tunnel was opened to traffic and from then on relieves the people of Zurich off the trough traffic.

Western Bypass Zurich (German)

Data Sheet

Country, Location

Switzerland, Zurich

Year

2004 – 2006

Application

Road

Geology

Rock
Upper fresh water molasse, calcareous partly clayey and sandy mudstone, fine sandstone with silt content

Tunnelling length

9,346 m

Machine Data

1x Single Shield TBM:
Diameter: 11,860 mm
Lining method: Segmental lining
Cutterhead power: 1,760 kW
Torque: 3,929 kNm