Additional equipment

Fully equipped for your tunnelling project

We want things to run smoothly on your jobsite

Smooth processes are the basis for completing every tunnel project on schedule and on budget. We provide equipment that ensures you're prepared for every challenge.

On the jobsite everything has to run smoothly. All processes must work together, the logistics chain function seamlessly. Because time is money. With “Full Range Tunnelling” we offer a wide range of integrated solutions for mechanized tunnelling and the requirements of your construction project. Together with our subsidiaries, we make sure everything goes hand in hand. Lean, but prepared for all eventualities – this is our holistic and integrated approach. Because even the best tunnel boring machine can only advance according to plan if the site logistics are optimally equipped and organized. We know that from experience.

Additional Equipment

Precise navigation and continuous data monitoring ensure that both microtunnelling machines and large diameter TBMs reach their intended destination safely.

Securing and lining modern tunnels is a complex process requiring seamlessly coordinated workflows.

Segment production systems

Ring by ring with precision

More
Combisegments®

Professional concrete protection

More
Rock support equipment

Roof bolting systems – a real safety bonus

More
Tunnel shutter

Tailor-made tunnel lining solutions

More

Integrated logistics systems ensure a high availability of the TBM and thus efficient and economical construction progress.

Belt conveyor systems

Top performance for the removal of excavated material

More
Rolling stock

Prompt supply for fast advance

More

Your contact person Contact us

Steffen Dubé President and General Manager Herrenknecht Tunnelling Systems USA Inc.
Gerhard Goisser Commercial Manager Herrenknecht Tunnelling Systems USA, Inc.