Doha tunnels its way to the top
Tunnelled into the Guinness Book of Records
From August 2014 to September 2016, on three main lines (Red Line, Green Line, Gold Line) four international joint ventures consistently pushed forward a total of 21 TBMs designed and equipped by Herrenknecht specifically for the project. A performance presentation of superlatives. 470,497 individual concrete segments (so-called lining segments) were mechanically assembled into 70,071 high quality tunnel rings. At peak times 20 TBMs tunnelled their way forward simultaneously, 2.5 kilometers per week of spotless metro tunnels grew under Doha. This Olympic quality parallel performance has gained the project a place in the Guinness Book of Records. In addition to the geology consisting primarily of Simsima Limestone, the demands on each TBM were complex – just from the dense urban development alone. The routes of the individual metro lines run under highly populated areas, for example near the impressive beach promenade Corniche, under the high-rise neighborhoods of Doha City and the tourist centers with their attractive hotel facilities. Settlement-free tunnelling was therefore one of the core requirements during construction.
The centerpiece of a grand vision
The newly emerging metro system in Doha is only the beginning of the mobilization of public transport in Qatar. Whether in the urban centers or in the countryside – everywhere people will be able to travel by public transport. "Qatar’s vision is to connect every corner of the country by public transport," explains Demmler. "The Doha Metro project represents the supporting backbone of an integrated public transport system," says Qatar's Minister of Transport Katar H.E. Jassim Saif Ahmed al Sulaiti in describing the substantial significance of the metro network, the first three lines of which are scheduled to be opened by 2020. By 2026 an extensive expansion by 72 additional stations and another metro line is planned. The station Msheireb in the center of the metropolis already forms the accumulation point of the whole system. All lines meet here, 12 breakthroughs ended at this mammoth station alone. Linked in all directions of the city, soon every metro journey will save valuable time and several kilograms of polluting greenhouse gases compared to a trip by car. Acceleration, mobility and environmental protection are the driving forces of the mega project. The development of the regional and national network will conveniently bring all residents of Qatar closer together.In 26 months, four international construction joint ventures have built a 111 kilometer metro tunnel system in Doha on three lines – a new benchmark worldwide. Cleverly master-planned and highly professionally directed by client Qatar Rail, a rapid pace was maintained at all times while ensuring the highest standards of safety, quality and health.
Herrenknecht's contractors are:
- for the Red Line North the ISG joint venture (Salini Impreglio S.p.A./ SK Engineering & Constructing Co Ltd/ Galfar Al Misnad Engineering & Constructing W.L.L
- for the Red Line South the Qatari Diar Vinci Construction JV (QDVS)/ GS Engineering & Construction Corp./ Al-Darwish Enginering W.L.L
- for the Green Line Contractor PORR Bau GmbH/ Saudi Binladin Group Company Ltd/ Hamad Bin Khalid Contracting Co. W.L.L.
- for the Gold Line the joint venture Aktor S.A./ Larsen & Toubro Limited/ Yapi Merkezi Insaat VE Sanayi Anonim Sirketi/ Sezai Turkes Feyzi Akkaya Marine Construction/ Al Jaber Engineering LLC)
Project film: Flow³ - Championship Alliance in Doha
http://allaround.herrenknecht.com/en/issue-5.html#flow
Client website
Machine Data S-844-849 / S-860-868 / S-920-925
Machine type: 6 x EPB Shield
- Shield diameter: 7,050 mm
- Drive power: 1,440 kW
- Torque: 4,769 kNm
Machine type: 9 x EPB Shield
- Shield diameter: 7,050 mm
- Drive power: 1,280 kW
- Torque: 4,239 kNm
Machine type: 6 x EPB Shield
- Shield diameter: 7,110 mm
- Drive power: 1,440 kW
- Torque: 4,769 kNm
-
Project: Doha Metro, Doha, Qatar
-
Client: Qatar Rail
-
Contractors:
Red Line North: ISG joint venture (Salini Impregilo S.p.A./ SK Engineering & Construction Co. Ltd/ Galfar Al Misnad Engineering & Contracting W.L.L.)Red Line South: Qatari Diar Vinci Construction (QDVC); GS Engineering & Construction
(GS E&C); Al Darwish Engineering (ADE)Green Line: PORR Bau GmbH/ Saudi Binladin Group Company Ltd/
Hamad Bin Khalid Contracting Co. W.L .L.Gold Line: Aktor S.A./Larsen & Toubro Limited / Yapi Merkezi Insaat VE Sanayi Anonim Sirketi / Sezai Turkes Feyzi Akkaya Marine Construction / Al Jaber Engineering LLC
-
Geology: Mainly Simsima Limestone, Midra Shale and Rus Formation
-
Advance lengths: Red Line North: 22.8 kilometers, Red Line South: 32.6 kilometers,
Gold Line: 23.3 kilometers, Green Line: 33.4 kilometers; all lines were built as parallel twin tunnels